Landslide Performance Test System – Release 24.3 September 2024
All of the parameter topics for the DRA Node test case are listed below:
Secondary DRA Node
Load Balancing
Command Mode
Off Enabled Sequencer
BSF (Nbsf)
NRF Interface
Mobile Subscribers
Number of Session per Subscriber
Max Concurrent Transactions
DSCP Value
© 2024 Spirent Communications Inc. All Rights Reserved.